Kitchen Cabinet Installation Cost in 2026: Chicago Suburbs
October 20, 2026 · 6 minute read · Carpenter Next Door
Short answer
In the Chicago suburbs, labor to install kitchen cabinets in a typical 10 by 10 kitchen usually runs $2,200 to $4,800 when you supply the cabinets. Flat pack assembly, taking out the old cabinets, and crown molding push the price toward the top. The cabinets, countertops, and any plumbing are extra.
What the $2,200 to $4,800 covers
This range is for labor only. It assumes you already bought the cabinets and they are in the house. The pro finds the studs, marks a level line, and hangs the upper cabinets first. The base cabinets go in next. Each one is shimmed so the countertop will sit flat. Filler strips close the gaps at the walls, and the doors and drawers get adjusted so the gaps line up.
A 10 by 10 kitchen is a common way to size a kitchen. It means two walls, each about 10 feet long, in an L shape. If your kitchen is bigger or has more cabinets, the price goes up with it. If it is a small galley with a few cabinets, it can come in near the low end.
These are typical local ranges for DeKalb County, the Fox Valley, and the northwest suburbs. They are not quotes. The pro who calls you back gives you their own price after they see the job.
Cost by kitchen size and setup
| Your kitchen | Typical labor | Why |
|---|---|---|
| Small or galley kitchen, cabinets already built, old ones already out | $2,200 to $3,000 | Fewer boxes and no tear out |
| About 10 by 10, cabinets already built | $3,000 to $4,000 | Two to three days of hanging and leveling |
| About 10 by 10, flat pack boxes, old cabinets still up, crown molding wanted | $4,000 to $4,800 | Assembly, removal, and trim all add hours |
| Larger than 10 by 10, or extra tall uppers | Above $4,800 | More cabinets means more labor, priced from your layout |
The last row goes past the top of the range because the kitchen is bigger than the one the range is built on. An island is its own job. Installing a kitchen island usually adds $500 to $1,400 in labor for building it and anchoring it to the floor.
What changes the price
- Flat pack or assembled. Cabinets that come in flat boxes have to be built before they can be hung. That can add a full day.
- Old cabinets. Taking out old cabinets and patching the wall behind them adds time. If yours are already out, say so.
- Walls and floors. Older homes rarely have straight walls or level floors. More shimming and trimming means more hours.
- Trim work. Crown molding, light rail, and scribe molding are cut and fit by hand.
- The count of cabinets. The price follows the number of boxes more than the square feet of the room.
- Moving the sink, stove, or dishwasher. If water lines move, that part needs a licensed plumber and is priced on its own.
What is not in the price
The cabinets themselves are not included. Neither is the countertop, the backsplash, or any plumbing or electrical work. Here are typical local labor ranges for the jobs that often come right after the cabinets go in.
| Next job | Typical labor | Notes |
|---|---|---|
| Laminate, butcher block, or prefab countertops | $500 to $1,500 | Stone slabs come with their own crew |
| Backsplash tile | $500 to $1,300 | Thinset and grout are included |
| Dishwasher or disposal hookup | $175 to $400 | Needs a licensed plumber |
| Hardwired under cabinet lighting | $350 to $900 | Needs a licensed electrician |
You can read more on the countertop installation and backsplash tile pages. In Illinois, plumbing work you hire out must be done by a licensed plumber. Ask who will hook up the dishwasher and any new water lines, and whether that person holds a plumbing license.
What to have ready
A pro can give you a better price on the first call when you have a few things on hand. Gather these before you reach out.
- Your cabinet plan or the layout drawing from the store
- Photos of each kitchen wall, with the old cabinets in place or already out
- Whether the cabinets are built or still in boxes
- Whether you want the pro to take out and haul away the old cabinets
- Where the water shutoff is under the sink
- The date the cabinets will arrive, if they are not here yet
What to ask the pro
- Is building flat pack cabinets part of your price, or extra?
- Will you remove and haul away the old cabinets?
- Who handles the plumbing and electrical parts, and are they licensed?
- How many days will the kitchen be out of use?
- What happens if you find water damage or a bad wall behind the old cabinets?
- Will I get the total cost in a written contract before you start?
A good pro will not mind any of these questions. Clear answers up front are a good sign the job will go smoothly.
Next step
The Install kitchen cabinets page shows what the job involves, how long it takes, and what the pro will ask you. When you are ready, send a request with your layout and a few photos. One vetted local pro calls you back and gives you their own price. You pay the pro directly. You never pay this site.
Questions people ask
- How much does it cost to install kitchen cabinets in the Chicago suburbs?
- Labor for a typical 10 by 10 kitchen usually runs $2,200 to $4,800 when you supply the cabinets. Bigger kitchens cost more.
- Does the price include the cabinets?
- No. These ranges are labor only. You buy the cabinets, and the pro installs them.
- How long does cabinet installation take?
- Most kitchens take two to three days. Flat pack cabinets that need building can add a day.
- Do I need a plumber when I get new cabinets?
- You do if water lines move or a dishwasher or disposal gets hooked up. In Illinois, plumbing you hire out must be done by a licensed plumber.
- Should I get a written contract?
- Yes. Illinois law requires a written contract with the total cost for home repair or remodeling work over $1,000.
Sources
- Illinois Home Repair and Remodeling Act, 815 ILCS 513, Sections 15 and 20
- Illinois Plumbing License Law, 225 ILCS 320, Section 3
This guide is general information for homeowners, not legal advice.